2009 |
North-Hungarian Water Conservancy Directorate |
Natura 2000 hatásbecslés |
Natura 2000 Impact Assessment Documentation of „Flood rehabilitation of Szuha-valley” in the North Hungarian Operational Programme (NHOP ÉMOP-3.2.1/D-2008-0010) |
2009 |
Megatrend' 93 Corp. |
Natura 2000 hatásbecslés |
Natura 2000 Impact Report related to the construction of 16-apartment buildings on the real estates of 22046/10 and 22046/7 topographic lot number in Debrecen |
2008 |
I. Controll Ltd. |
Szakértői anyag |
Preparation of a proposal plan for the study-path with exhibition and field demonstration sites at the planed “Rakamaz aquatic study-path” in such a way, that is detailed enough for a compilation of an up to par project proposal. |
2009 |
SCREEN INTERNATIONAL Ltd. |
Egységes Környezethasználati Engedély |
Preparation of a uniform environment utilization permit documentation in the frames of the environment utilization permit procedure concerning the planned wood-burning power plant of 19.9 MWe capacity, supplied from an energy plantation, located in Tiszabezdéd. |
2009 |
North-Hungarian Water Conservancy Directorate |
Előzetes Környezeti Hatásvizsgálat |
Preliminary Enviromental Impact Report concerning interventions planned in the frames of the development of the right-side dam of river Tisza between the sections of 48+400-53+100 dkm |
2009 |
North-Hungarian Water Conservancy Directorate |
Előzetes Vizsgálati Dokumentáció |
Preliminary Examination Report concerning interventions planned in the frames of application ÉMOP-3.2.1/D-2008-0001 “Reconstruction of Gyöngyös-Nagy-patak” |
2009 |
North-Hungarian Water Conservancy Directorate |
Előzetes Vizsgálati Dokumentáció |
Preliminary Examination Report of the Tisa river's right coast's development between 48+400-53+100 rkm |
2009 |
Hortobágy National Park Directorate |
Előzetes Vizsgálati Dokumentáció |
Preliminary Examination Report for the purpose of environmental permit concerning the planned rehabilitation of two backwaters of the River Bereg (Foltos-kerti-Holt-Tisza and Boroszló-kerti-Holt-Tisza) |
2009 |
VTK INNOSYSTEM Víz-, Természet-és Környezetvédelmi Kft. |
Komplex természetvédelmi/ökológiai kutatás |
Ecological status survey in the frames of the planned rehabilitation of Nádor-csatorna (Nádor Channel), as well as wildlife and nature protection related impact assessment in the framework of an environmental impact study. |
2009 |
Public Utilities Designer and Executing Agency Corp. (Eger) |
Natura 2000 hatásbecslés |
Impact assessment documentation for the Natura 2000 area HUBN10002 (Borsod-plain) related to the permission-request to water-bed adjustment between the sections of 1+100 and 14+139 river kms of the Kánya-stream |
2009 |
North-Hungarian Water Conservancy Directorate |
Natura 2000 hatásbecslés |
Natura 2000 Impact Assessment concerning interventions planned in the frames of the development of the right-side dam of river Tisza between the sections of 48+400-53+100 dkm |
2009 |
Central-Tisza-Region Environmental and Water Management Directorate |
Natura 2000 hatásbecslés |
Natura 2000 Impact Assessment concerning interventions in the planned project „Development and reconstruction of the flood-protective constructions at Sajfok„ |
2009 |
MOL Plc. |
Natura 2000 hatásbecslés |
Natura 2000 impact assessment documentation of the hydrocarbon exploratory drilling planned to be performed on real estate topographical no. 02292/25, Karcag-NE-1. |
2008 |
Békés County Environmental and Nature Conservational Ltd. |
Szakértői anyag |
The operative biomonitoring plan of environmental impact assessment of the sewage treatment site being established on the yard of Bonduelle Nagykőrös Kft. in Nagykőrös. |
2008 |
Kárpát Energo cPlc. |
Szakértői anyag |
Assessment of the botanical effects of interventions in Vásárosnamény planned medium water bed related to the KCE 230 MW cooling water supply system |
2009 |
Belemnites Engineering Ltd. |
Előzetes Környezeti Hatásvizsgálat |
Preparation of the wildlife protection chapters of the Preliminary Examination Report for preparing the permission of investments planned in the Shoal Szabadság region of Mohács. |
2009 |
Central-Tisza-Region Environmental and Water Management Directorate |
Előzetes Környezeti Hatásvizsgálat |
Preliminary Examination Report for the interventions in the planned project „Development and reconstruction of the flood-protective constructions at Sajfok„ |
2009 |
North-Hungarian Water Conservancy Directorate |
Előzetes Vizsgálati Dokumentáció |
Preliminary Examination Report concerning interventions planned in the frames of application ÉMOP-3.2.1/D “Rehabilitation and environment development of the Gyöngyös-Nagyréde Reservior” |
2009 |
North-Hungarian Water Conservancy Directorate |
Előzetes Vizsgálati Dokumentáció |
„Flood rehabilitation of Szuha-valley” in the North Hungarian Operational Programme (NHOP ÉMOP-3.2.1/D-2008-0010) |
2009 |
Central-Tisza-Region Environmental and Water Management Directorate |
Előzetes Vizsgálati Dokumentáció |
Preliminary Examination Report of the interventions on Tisa-lake in the „Complex Tisa-lake project” |
2009 |
City government of Albertirsa |
Natura 2000 hatásbecslés |
Impact assessment documentation relating to the establishment of a sport facility on the administrative territory of Albertirsa, located on Natura 2000 site of HUDI20021 (Gerje-mente) |
2009 |
North-Hungarian Water Conservancy Directorate |
Natura 2000 hatásbecslés |
Natura 2000 Impact Assessment concerning interventions planned in the frames of application ÉMOP-3.2.1/D “Reconstruction of Nyögő Stream and reduction of the exposure of settlements in Pitypalatty Valley to flood hazard” |
2009 |
North-Hungarian Water Conservancy Directorate |
Natura 2000 hatásbecslés |
Natura 2000 Impact Assessment concerning interventions planned in the frames of the development of the water pumping plant at Törökér |
2009 |
Central-Tisza-Region Environmental and Water Management Directorate |
Natura 2000 hatásbecslés |
Natura 2000 Impact Assessment in the project of „Interoperability of protected areas on the Tisza-lake” |
2009 |
Tiszamelléki Civil Engineering Ltd. |
Natura 2000 hatásbecslés |
Natura 2000 Impact Assessment concerning the interventions of the reconstruction of fish-pond Farkas-háti 12 on the periphery of settlement Folyás |